Burchard Park Little League Fields at College Pond
Weston, MA
Project Overview
McKenzie Engineering Group, Inc. (MEG) provided design phase services for the renovations to the existing athletic fields at the College Pond recreational complex. The design involved the realignment of two existing baseball fields and the addition of three new fields, reconfiguration of and new bituminous driveways, bituminous and gravel parking areas, 1,600 square foot bathroom/concession/storage building, on site wastewater treatment system, stormwater management systems and utility connections. MEG was also responsible for obtaining all permits required to construct the project and provided construction administration services as well.